Dedicated to thoughts about software testing, QA, and other software quality related practices. I will also address software requirements, tools, standards, processes, and other essential aspects of the software quality equation.
Thursday, May 27, 2010
Webinar Links - Ellusive Tester to Developer Ratio
Thanks for tuning in to the webcast today.
Here are the links for the recorded session and chat transcript, along with other things I mentioned.
Recorded webinar
Chat transcript
Slides in PDF format
CTE-XL tool
Article - Ellusive Tester to Developer Ratio (The one I wrote back in 2000)
Thanks!
Randy
Sunday, May 23, 2010
May 2010 Newsletter Posted
Better late than never! The May issue of the Software Quality Advisor Newsletter is out:
http://riceconsulting.com/home/index.php/Newsletter-Past-Issues/may-2010-test-estimation-based-on-testware.html
You can get your copy each month to your e-mail account by signing up at:
http://riceconsulting.com/home/index.php/Newsletter/the-software-quality-advisor-newsletter-sign-up.html
Friday, May 21, 2010
Webinar - Thursday, May 27 - The Elusive Tester to Developer Ratio
To join the meeting, visit https://my.dimdim.com/ricecon on May 27 at 11:50 a.m., CDT. The webinar starts at 12:00 noon.
Wednesday, May 19, 2010
Book Review - Reflections on Management by Watts S. Humphrey with William R. Thomas
The Capability Maturity Model (CMM) and Capability Maturity Model Integrated (CMMI) have been major forces in software development for at least 20 years. Along with those, the Personal Software Process (PSP) and the Team Software Process (TSP) have also been applied to help make software projects more predictable and manageable.
This book is a collection of essays and articles written by Watts Humphrey, the man who was the influence and drive behind these models and processes. I found this book to be an interesting journey through the thinking of Humphrey as he clearly and rationally outlines the "why" behind the "what." Then, he describes "how" to do the work of managing intellectual and creative people which have to work together to deliver a technical product - on time, within budget, with the right features and with quality.
There are many gems in this very readable book (a great airplane book), such as:
- Defects are Not Bugs
- The Hardest Time to Make a Plan is When You Need it Most
- Everyone Loses With Incompetent Planning
- Every New Idea Starts as a Minority of One
- Projects Get into Trouble at the Very Beginning
- Managing Your Projects
- Managing Your Teams
- Managing Your Boss
- Managing Yourself
Although this book is a collection of essays, it flows very well and reads like it was written as one book. By the way, I felt the Epilogue was excellent - don't skip it.
If there are any doubts about the credibility factor of this book, the advance praise at the front of the book spans four pages and reads like a "who's who" of software development: Steve McConnell, Ed Yourdon, Ron Jeffries, Walker Royce, Capers Jones, Victor Basili, Lawrence Putnam and Bill Curtis, to name a few.
Whether you are fully immersed in the agile project world, or following the CMMI, or just trying to figure out the best way to plan, conduct and manage software projects, this is a book worth reading and taking to heart. In the advance praise, Ron Jeffries (www.XProgramming.com) writes, "I've followed Watts Humphrey's work for as long as I can remember. I recall, in my youth, thinking he was asking too much. Now that I'm suddenly about his age, I realize how many things he has gotten right. This collection from his most important writings should bring these ideas to the attention of a new audience: I urge them to listen better than I did."
Amen, Ron, amen.
Reviewed by Randy Rice
Disclosure of Material Connection: I received one or more of the products or services mentioned above for free in the hope that I would mention it on my blog. Regardless, I only recommend products or services I use personally and believe will be good for my readers. Some of the links in the post above are “affiliate links.” This means if you click on the link and purchase the item, I will receive an affiliate commission. Regardless, I only recommend products or services I use personally and believe will add value to my readers. I am disclosing this in accordance with the Federal Trade Commission’s 16 CFR, Part 255: “Guides Concerning the Use of Endorsements and Testimonials in Advertising.”
Test Estimation Based on Testware
However, there is a technique I have used over the years that plays on risk-based approaches. This technique can be applied to testware, such as test cases. Just remember this is not a scientific model, just an estimation technique.
What is Testware?
Testware is anything used in software testing. It can include test cases, test scripts, test data and other items.
The Problems with Test Cases
Test cases are tricky to use for estimation because:
They can represent a wide variety of strength, complexity and risk
They may be inconsistently defined across an organization
Unless you are good at measurement, you don’t know how much time or effort to estimate for a certain type of test case.
You can’t make an early estimate because you lack essential knowledge – the number of test cases, the details of the test cases and the functionality the test cases will be testing.
Dealing with Variations
“If you’ve seen one test case, you’ve seen them all.” Wrong. My experience is that test cases vary widely. However, there may be similarity between some cases, such as when test cases are logically toggled and combined.
A technique I have used to deal with test case variation is to score each test case based on complexity and risk, which are two driving factors for effort and priority.
The complexity rating is for the test case, not the item being tested. While the item’s complexity is important in assessing risk, we want to focus on the relative effort of performing the test case. You can assign a number between 1 and 10 for the complexity of a test case. It may be helpful to create criteria for this purpose. Here is an example, You can modify it for your own purposes.
1 – Very simple
2 – Simple
3 – Simple with multiple conditions (3 or less)
4 – Moderate with simple set-up
5 – Moderate with moderate set-up
6 – Moderate with moderate set-up and 3 or more conditions
7 – Moderate with complex set-up or evaluation, 3 or more conditions
8 – Complex with simple set-up, 3 or more conditions
9 – Complex with moderate set-up, 5 or more conditions
10 – Complex with complex set-up or evaluation, 7 or more conditions
This assessment doesn’t consider how the test case is described or documented, which can have an impact on how easy or hard a test case is to perform.
Assessing Risk
Risk assessment is both art and science. For estimation, you can be subjective. In fact, my experience is that risk assessment is subjective at some point or other.
This scale is based on the risk (impact) of the test case and its priority in the test. Like the complexity ranking, here are sample criteria you can adapt for your own situation:
1 – Lowest priority, lowest impact
2 – Low priority, low impact
3 – Low priority, moderate impact
4 – Moderate priority, moderate impact
5 – Moderate priority, moderate impact, may find important defects
6 – Moderate priority, high impact, has found important defects in the past
7 – High priority, moderate impact, new test
8 – High priority, high impact, may find high-value defects
9 – High priority, high impact, has found high-value defects in the past
10 – Highest priority, highest impact, must perform
Actually, the risk level could be seen from two perspectives - the risk of the item or function you are testing, or the risk of the test case itself. For example, if you fail to perform a test case that in the past has found defects, that could be seen as important enough to include every time you test. Not testing it would be a significant risk. The low risk cases would be those you could leave out and not worry about. Of course, there is a tie-in between these two views. The high-risk functions tend to have high-risk test cases. You could take either view of test case risk and be in the neighborhood for this level of test estimation.
Charting the Test Cases
To visualize how this technique works, we will look at how this could be plotted on a scatter chart. There are four quadrants:
1 – Low complexity, low risk
2 – High complexity, low risk
3 – Low complexity, high risk
4 – High complexity, high risk
Each test case will fall in one of the quadrants. One problem with the quadrant approach is that any test case in the center area of the chart could be seen as borderline. For example, in Figure 1, TC004 is in quadrant 4, but is also close to the other areas as well. So, it could actually be in quadrant 1 if the criteria are a little off.
Figure 1
For this reason, you may choose instead to divide the chart into nine sections. This “tic-tac-toe” approach gives more granularity. If a test case falls in the center of the chart, it is clearly in section 5 (Figure 2), which can have its own set of test estimation factors.
Figure 2
All You Need is a Spreadsheet
With many test cases, you would never want to go to the trouble of charting them all. All you need to know is in which section of the chart a test case resides.
Once you know the complexity and risk scores, all you need to know are the sections on the chart. For example, if the complexity is 3 or less and the risk is 3 or less, the test case falls in section 1 of the nine-section chart. These rules can be written as formulas in a spreadsheet (Figure 3).
Figure 3
Sampling
So, what if you don’t have a good history of how long certain types of test cases take to perform? You can take samples from each sector of the chart.
Take a few test cases from each section, perform the test cases and measure how long it takes to set-up, perform and evaluate each test case.
You now extend your spreadsheet to include the average effort time for each test case (Figure 4).
Figure 4
Adjusting
Your estimate is probably inaccurate. There is a tendency to believe the more involved and defined the method is, the more accurate the estimate will be. However, the reality is that any method can be flawed. In fact, I have seen very elaborate estimation tools and methods which look impressive, but were inaccurate in practice.
It’s good to have some wiggle-room in an estimate as a reserve. Think of this factor as dial you can turn as your confidence in the estimate increases.
Conclusion
Like with any estimation technique, at the end of the day, there could be any number of things that could impact the accuracy of most estimates. Estimates based on test cases can be helpful once you have enough history of measuring them.
Sampling can be helpful if you have no past measurements, or if this is a new type of project for your organization. It is still a good idea to measure the actual test case performance times so you can incorporate them in your future estimates.
I hope this technique helps you and provides a springboard for your own estimation techniques.
Tuesday, May 18, 2010
New Test Automation Class a Success!

Thanks to everyone that participated in last week's presentation of my newest workshop, Practical Software Test Automation in Oklahoma City. The class went well, we had a great time together, and I learned some adjustments I need to make. Thanks to the Red Earth QA SIG for their sponsorship.
We also got some positive buzz from Marcus Tettmar, the maker of Macro Scheduler. Thanks, Marcus.
http://www.mjtnet.com/blog/2010/05/13/new-software-testing-course-featuring-macro-scheduler/
We use Macro Scheduler as the learning tool in the course for test automation and scripting. By the way, version 12 has just been released. I look forward to trying it!
http://www.mjtnet.com/blog/2010/05/17/macro-scheduler-12-is-shipping/

The next presentation will be next month in Rome. If you live in Italy, or have a desire to take a testing class in a great location, join me there on June 16 and 17. I will also be presenting the Innovative Software Testing Approaches workshop that week in Rome.
Innovative Software Testing Approaches
http://www.technologytransfer.eu/event/984/Innovative_Software_Testing_Approaches.html
Software Test Automation
http://www.technologytransfer.eu/event/985/Software_Test_Automation.html
If you are interesting in having this workshop in your city or company, just contact me!
Wednesday, May 12, 2010
The 900+ Point Drop in the Dow - A Real-Life Root Cause Analysis Challenge
The other day when the Dow dropped over 900 points, it was blamed on some trader someplace entering an order to sell "billions" instead of "millions" of P&G stock. To date, they still cannot produce the trade or the trader. Something doesn't smell right.
1. I would think that level of trade would require some sort of secondary approval.
2. Isn't there an audit trail of trades that would lead back to the trader?
3. If a billion dollar trade could do this, shouldn't there be an edit or at least warning message, "You have entered an amount in the billions. Click OK to bring down the entire global financial system."
This makes me question if this was really the case. Other possibilities could be:
1. A run on stocks that was truly panic selling and this was a way to explain it away without spooking everyone else in the country. I guess this is the "conspiracy theory" view.
2. A software defect...and maybe not a simple one. This could be one of those deeply-embedded ones. I know a little about how the Wall St. systems and processes work and believe me, this is not beyond the realm of possibility.
It may be impossible to know for certain. One would have to perform a deep dive root cause analysis, go through the change logs (if they exist), look at the exact version of code for everything going on at that time, look at a highly dynamic data stream...you get the idea. That probably won't happen. If someone does manage to isolate this as a software defect and can show it, I nominate them for the Root Cause Analysis Hall of Fame, located in Scranton, Pa. (Don't go looking for that...but there is a Tow Truck Museum in Chattanooga, TN.)
Just a random thought...
Tuesday, May 04, 2010
Great Customer Service in Action at Blue Bean Coffee
However, people know great service when they see it.
This morning I was having coffee with my pastor at Blue Bean coffee here in south Oklahoma City (SW 134 and Western). All of a sudden, the lady behind the counter ran out the door with a can of whipped cream in her hand. Turned out she had forgotten to top off the customer's drink. She said, "That would have bothered me all day."
Wow. That made an impression. Really, it's not that big a deal, but in today's "lack of service" culture it stands out.
Compare that to my experience a couple of weeks ago at Starbucks, not too far away. I go in with my own mug and ask for the free cup of coffee they were promoting for Earth Day. (This happened on Earth Day!) The barista looked confused and went in the back office to ask the manager. He came back out and said, "Sorry, that was last week." "OK," I said. "I guess I'll have a tall bold." To which he replied, "We only have a little left." "Is is fresh," I asked. "We change it every 30 minutes," he said. Now, you coffee drinkers out there know that a little coffee left on the heat for even a short time gets bitter, but I took my chances. Turned out, it was bad but I has already left. I complained to Starbucks online and got a good response back and two free drink coupons.
I was left wondering, though, how hard would it have been for the barista to simply say, "That promotion was last week, but here, have a cup anyway."? Perhaps he was not empowered to do that, or maybe he just wasn't thinking about the lifetime value of a customer.
Remember how Starbucks has tried all the other "ambiance" stuff - music, etc. I applaud the efforts at creating an experience, but to me the customer, I don't go to Starbucks for music. I go there for coffee and hope for decent service. Sometime they are friendly and sometimes they aren't. For the longest time all they served was Pike Place. Then, finally, someone in corporate woke up and decided to start offering different blends again.
All I can say is that I'll use those Starbucks coupons on the road and get my local coffee at Blue Bean. It's more personal, more friendly and they have better coffee. And that's what it's all about - the coffee and the service.
Keep that in mind as you serve people in IT. If you give great service and have a great product, people will find you irreplaceable and keep coming back for more. You will be more personal and more valuable.
Thursday, April 29, 2010
StarEast 2010
A Deeper Dive into Dashboards
PowerPoint slides of the presentation (PDF)
Excel dashboard with macros
Excel dashboard without macros
The Xcelsius dashboard example
The full 16 minute video of how I created the dashboard
(The reason I give both versions is because the macro-enabled one will update if you are connected to the Internet.)
Here are a couple of the websites I mentioned:
www.dashboardspy.com
www.datapigtechnologies.com
The Elusive Tester to Developer Ratio
We were discussing how to leverage high ratio situations, like 1 tester to 10 developers and higher. The question was asked about how to get testers more on-board with doing unit testing. One suggestion I had was to provide with with a checklist. Here is a unit test workbench with two checklists. This is in Word format, so feel free to modify it to meet your needs.
By the way, I plan to have narrated versions of both presentations posted soon on my website.
Stay in Touch With Me!
There are several ways to stay in touch:
1) Sign up for my newsletter
2) Follow me on Twitter - @rricetester
3) Become a Facebook fan
I hold a monthly drawing for free books for my newsletter subscribers and Facebook fans. The next one is on May 1.
Thanks and have safe travels home!
Sunday, April 25, 2010
Oklahoma City Test Automation Training Workshop - May 13 and 14, 2010
This workshop is sponsored by the Red Earth QA SIG and hosted by Devon Energy. Thanks greatly to those organizations.
This workshop is not oriented to any specific tool, but the lessons and concepts are transferable to any tool. We will be using some free and inexpensive tools for the exercises, so bring your own computer.
Nervous about scripting? That's OK. You will be able to work at a pace that suits you and I along with others in the workshop will be there to help.
To learn more and to register, just visit http://www.mysoftwaretesting.com/product_p/okcauto.htm
If you would like for me to come to your company and present the workshop, just call me at 405-691-8075.
Thanks!
Randy
Friday, April 23, 2010
My Take on the McAfee Mess
On April 21, McAfee released an update to their anti-virus application that disabled systems running Microsoft XP SP3. This caused a bad day at McAfee, but even worse days at all the companies and homes that were impacted.
You can read the early account here:
http://www.computerworld.com/s/article/9175928/The_McAfee_update_mess_explained?source=toc
Then, today, a more detailed explanation and apology was issued:
http://www.computerworld.com/s/article/9175940/McAfee_apologizes_for_crippling_PCs_with_bad_update?source=CTWNLE_nlt_dailyam_2010-04-23
The bottom line was a critical defect was missed and made its way to customers. Here are my observations as an interested bystander and software testing consultant:
1) The apology was cryptic for a technical audience. "We recently made a change to our QA [quality assurance] environment that resulted in a faulty DAT making its way out of our test environment and onto customer systems." However, no explanation of the change was given. Was a platform removed, or skipped? Was a test case skipped? Was there a rush to get the update out? Why was the environment changed? The blame seems to be on the change to the environment.
2) The risk was very high. This is the tester's worst nightmare and an example of what you don't want your company to go through, or your customers. This is a credibility-basher. I work with some software companies that say "We don't care about the risk. If there are problems, we'll just post a hotfix on the web site." Right.....
3) Testing can't find all the defects. However, testing is an easy role to place blame. At least they didn't blame the testers - they blamed the process and the environment, which is probably the appropriate place to focus.
4) This points out a big risk for COTS applications - applying an update without testing it. I know the updating process is automated for large companies. However, one of the things I teach in my COTS testing class is to test the updates before rolling them out to the entire company. I suspect this will be one of those lessons learned for many people. The really troubling thing is for individuals who get impacted. They have no "test" PCs.
5) The customers want to hear from the CEO over this. So, your CEO doesn't seem to care about testing? This is a good case study to show why they should care.
6) Your test is only as good as your environment. You may have great tools, great testers and great processes, but if you have gaps in your environment, you don't know for sure what you are testing.
7) This is one of those head-bangers. Apparently, this was not one of those deeply-embedded defects, but one that could have been found just in a simple update to a commonly-used platform. This is one of those defects that leaves management and customers asking, "Why didn't you guys test that? (I refer you back to observation #1) They aren't saying for sure.
8) There will be more defects escape in the future. The only question is, what will the impact be? If you really want a scare, take this scenario out to medical devices, aircraft, automobiles, utilities and other safety-critical applications. No matter how hard we try, there will still be defects because we can't test everything. That's not an easy reality to embrace because many people have grown to trust that software just works - mostly. Testers know better
OK, enough of being the armchair quarterback. This is serious and frustrating, but not the end of the world. A few weeks from now, it will all be forgotten. Actually, that's part of the problem. We experience the pain, the pain goes away, then we experience it again...and again.
Your thoughts?
Thursday, April 22, 2010
Striving for Quality has Real Payoffs
http://www.computerworld.com/s/article/9175836/Striving_for_quality_has_real_payoffs?taxonomyId=14&pageNumber=1
The common misconception is that the 20th century quality gurus, like Deming, Juran and Crosby were out there teaching about quality for the sake of virtue. The reality is that they taught quality concepts as a way to build the bottom line in a company by gaining customers and serving existing customers better. That's why I get really annoyed at people who dismiss quality improvement as an optional thing. I agree that "quality" has been so overused is fails to resonate anymore with people, but so does "safety" until you get hurt or killed. The problem is not the concept but our thinking (or lack of attention).
Read this article and learn how to make the message to management. The great thing about this article was that management made the mandate to IT. And that is exactly the direction the quality mandate should flow.
Have a quality day!
Randy
Wednesday, April 21, 2010
Technology is Just the Tool
— Joseph Priestley: Was an 18th-century theologian and educator
Isn't it interesting that this was written in the 18th century? It's like the idea that instead of technology making our lives easier, it has done just the opposite. Technology is just the tool. You can use any tool relentlessly and still wear yourself out. You can use any tool in an ineffective way.
One of my favorite lines from a movie is when Pappy O'Daniel says in "Oh Brother, Where Art Thou?" as he and his entourage are walking into the little radio station, "We ain't one-at-a-timin' here. We're MASS communicating!"
Sure, technology has changed the means of communication. What it has not changed is how we really connect with someone.
Saturday, April 17, 2010
10 Reasons Why You Aren't Done Yet
http://michaelhyatt.com/2010/03/10-reasons-why-you-aren%E2%80%99t-done-yet.html
Friday, April 16, 2010
It's About Communication
I ran across an interesting article this morning at computerworld.com about how one CIO does this :
CIO says communication is key to buy-in
No matter which role you are in, communication is a big part of your job, whether you practice it or not.Here are some quick tips:
1) Be intentional
You have to keep communication in mind and be thinking all the time, "Who needs to know this?" You also have to be thinking "What do I need to know?" and "Whom should I be speaking with today?"
2) Do not confuse e-mail and meetings with communication
These can be vehicles for communication, but they have flaws. E-mail fails to convey the tone of our communication and meetings can drift into discussions of many topics. Just pick up the phone or walk down the hall if you really want to touch base with someone.
3) Practice
Yes, practice how you say things. Learn the words that carry meaning and power. Learn how to control your body language and read the body language of others. Do you have a big presentation in your future? Do you have an important conversation with someone soon? Practice!
4) Read before sending
So you've written an e-mail, status report or some other piece of written communication. Take an extra 60 seconds and read back through it. Place yourself in the role of the people who will receive it. How would be feel if you were the recipient? Are there any obvious gaps, typos, or other mistakes? Testers get nailed on this because we are highlighting others' mistakes. People aren't perfect, but try to find mistakes the best you can.
A really good book on this subject is Naomi Karten's "Communication Gaps and How to Close Them".
I hope I have communicated my thoughts on this well! Your thoughts?
Have a great day.
Randy
Thursday, April 08, 2010
Being a Linchpin in a Process-Oriented Environment
In Linchpin, Seth Godin writes about becoming indispensable at our jobs by becoming more unique. We become more unique by letting the artist in us shine forth in what we do. Godin admits there are times you would not want this, like for airline pilots, etc. However, that specific example caused me to think about Captain Sullenberger who skillfully guided the U.S. Airways jet to a safe landing in the Hudson River. That was artistry. My friend Frank pointed out this was not because of his training from the airline, but because he knew how to fly gliders. Interesting.
In a factory setting, you want people making the same things in the same way. Dr. Deming taught people to remove variations in the process. He taught that processes should be so well defined that anyone with the right training could perform them with identical results. We can apply that in some ways to software development. So, how does one let their artistry shine in that kind of process-oriented environment?
Frank observed that Quality Circles was a technique Dr. Deming taught to let the workers in a process have a voice in improving it. Those people who are good at seeing problems and suggesting changes to the process that save the company money are linchpins and artists. You would not want people to start changing the process whenever or however they want, but you do want to know how to improve the process at the right time, in the right way.
Certainly Dr. Deming valued the person and how they contribute to quality. However, he was not a proponent of surviving by heroic efforts. The problem of heroic efforts is that is rewards those who do sloppy work and then swoop into to fix it, while those who consistently do good work get little recognition.
Unfortunately, too many good people suggest good ideas to management and those ideas are ignored. These people often leave for companies that do value their ideas. They can do that and get more money in the process because they add value. They are linchpins. This applies to leaders as well. Leaders who listen to ideas will rise and succeed, while those who don't will continue to struggle.
Your thoughts?
Randy
Friday, April 02, 2010
Book Review - Linchpin by Seth Godin

For a long time I have been telling software testers there is someone out there, either in their city or halfway around the world, that can test faster and cheaper than they can. Like it or not, software testing has become a commodity for many organizations. It doesn’t matter who is doing the testing, how they are doing it, only that testing is being done at a cost they are willing to pay.
These are the same companies who call me up to get “two days of training on testing” then have no idea what their needs are, what will happened after the class, or even who will be the instructor. They just want “a pound of training” as I call it. This type of attitude means you need a point of distinction. That’s what this book is all about – how to become indispensable by letting the artist in you emerge.
Think of the companies that lay off hundreds or thousands of people all at once. How were those people chosen? They didn’t lay off everyone, so who got to stay and why? It wasn’t the people who obediently played by the rules and didn’t make waves. The ones who stayed were difference makers – linchpins.
This book takes you on a journey. It starts with some background of how we got here. After all, for all of human history except the last 60 years or so, people lived without the idea of being taken care of by a company. Now, we find ourselves in a different ballgame with a whole new set of rules. Having a good job is no longer the definition of success. Lots of “good jobs” have gone away, never to return.
The journey continues to discuss how to become that person that the company values so highly, they will do anything to keep you – the linchpin upon which there success depends.
Of course, becoming and staying a linchpin isn’t easy. There is a lot of resistance to stay in your comfort zone. Godin goes into detail about the choice required to become a linchpin and why it’s the choice between being remarkable and being a cheap drone.
The brilliant thing about this book is that Seth goes into depth about “the resistance”, the thing that keeps us from being unique and taking the risk to let our special gifts shine. It is so easy to want to blend in and go with the flow, but Seth makes a compelling case that this is the path toward extinction.
After reading the book and thinking of my experiences in consulting in many companies, I realize that the only difference between many companies and a chicken slaughterhouse is the lack of chickens. Every day people dutifully report for duty, keep their heads down, do what they are told to do (or not to do), then go home and do it all again the next day. The work is mindless, requires no creativity and at the end of the day, people leave unfulfilled and unappreciated – and a bit bloody.
At times I felt conflicted as I read Linchpin. I identify with being the artist. I tend to procrastinate, so the idea of setting a ship date for something and then shipping no matter what has actually helped to get some things done. On the other hand, I have seen so many companies suffer from the deadline mentality I can’t totally embrace that idea.
I think there is balance in the decision to ship or not to ship. In some cases, shipping bad stuff on the deadline can be very bad. In other cases, it can be the first faltering steps toward a great eventual product. I think it all depends on how understanding people are. For things like cars, airplanes and pacemakers, it’s a bad idea to ship just based on the deadline being reached.
The other point I have difficulty with is the idea of not being attached to your worldview. I agree that we need to be able to see and understand other people’s worldviews. My point of departure comes in being so unattached that you have no stable set of beliefs. I think it’s important to know why you hold your worldview and even be willing to question it. I also think it’s fine to be passionate about your beliefs. The key is whether or not your beliefs are based in truth. I know, I know, this opens up a great philosophical discussion about “what is truth?” I just think you can be a linchpin and still be true to your beliefs.
Finally, perhaps the most troubling realization of all is the contradiction of on my closely held beliefs in the idea of systematizing of processes. I really think Dr. Deming had it right about defining a process so that anyone could perform it without error. This is a good thing for factories, hospitals and fast food places that rely on consistency of results. However, when it comes to intellectual work, we need the creativity of the artist.
This leads me to the application of this idea to software testing. On one hand, we need high levels of accuracy and repeatability for some types of testing. On the other hand, we need the creativity of the artist for discovering new defects and ways of performing testing.
This is a great book, an essential book, for anyone in today’s marketplace. Both young and not-so-young will be better prepared to deal with the world by reading Linchpin. This is an easy read and I especially like the way Seth fleshes out his ideas in a stream of coherent small sections of writing. This alone has changed how I plan to write my future books - many of which now have publication dates! Thanks, Seth, for another insightful and timely book.
I will be continuing these thoughts here on my blog in the coming days, so come on and join the discussion!
Dirty Little Secrets About Software Test Estimation
The context of this article is about software test estimation, but some of these secrets can be seen in other types of estimating as well. This list is not intended to be complete, but rather the things I see most often in trying to estimate software testing efforts.
Secret 1 – Your Estimate is Probably Wrong
Take comfort in this. Too many people work and work to get “just right” estimates. The problems are:
1) As a tester, your estimates often depend on other estimates, such as the time needed for development, people available, etc. These numbers are often inaccurate, so that means yours will be also.
On one project, I was asked to come up with some quick estimates on about 15 projects for a given business. To help in this effort, I was sent a set of 15 documents, each of which contained estimates for one of the projects to be estimated. My approach was to apply a factor of 25% of the total development effort. Now this factor could be considered low, since the actual percentages can range between 20 and 50%.
However, there was one thing that made my test effort factor practically irrelevant. Many of the prior estimates had “TBD” on the design and code efforts. This gap in data rendered my assumptions to the level of sheer guesswork. I had a bigger problem, though. My client still wanted estimates. What's a consultant to do?
In this case, I made some assumptions with a warning that the estimates could be way off. I estimated the effort to design the project equal to that of gathering and documenting requirements. I also made the effort to code the projects the same as the effort to design the project. Yes, this gave the same number for person-weeks for requirements, design and coding. Keep in mind I had no resource numbers at this point, only estimated weeks of effort. I documented my assumptions and also the low confidence I had in the estimate. I assured my client the estimate would change once we had numbers for design and coding. Plus, we would need resource estimates before we could estimate costs.
About a week later, I got the missing data. Not surprisingly, the newly supplied estimates for design and coding were different from the ones I assumed. So, I used the new numbers and my estimates changed. I have yet to know how accurate any of the estimates are at this point.
(By the way, as things turned out, none of the projects were ever started!)
2) The Project Scope Will Probably Change.
There's not much you can do about this. Scope change happens for a variety of reasons, some foreseen and some unforeseen.
You never know when new requirements will emerge. New opportunities can appear as well.
Last year, I had a fence installed at my home. When we first measured the dimension of the area to be fenced, I used the area that I had assumed was my property. Since there is not a house on the other side of us, I could not use the adjoining property as a basis. After reading the plat map, I learned that our property is actually about ten feet narrower than I had believed. For years, I have been watering, fertilizing and mowing about 1,000 square feet of property that did not belong to me!
This new information changed the scope and therefore, the estimate and final costs of the project.
Software projects are more complex than home improvements, and this makes the challenge even greater. Our assumptions get challenged and often proven wrong. Whether it is the scope of requirements or the number of resources needed, scope can change either up or down.
3) You Don't Know What You Don't Know.
And...you won't find that out until it's too late. This is one of the biggest project risks and impacts much more than estimates. There's not much you can do about this one either. Just keep an open mind, keep questioning decisions and information throughout the project. Realize that you don't know everything and what you do know will change.
Here are a couple of prime examples of project “surprises” :
- People will fudge numbers to make themselves look better. Realize this happens and always question information, whether it be bug counts, estimates or the time spent on testing a feature.
- Deliverables will be late. In fact, they will be later than you think they will. Some things will be early, but more often than not, your work will be delayed by delays experienced by others.
Secret 2 – Your Estimate Needs to be Wrong – In the Right Direction
Why do I say something so outlandish? You only know how close your estimate is when the work is done. When my focus is on the accuracy of the estimate, I am at risk of conforming the work to the estimate, not what is in the best interest of the project.
When you truly understand your estimate is just that – an estimate, you can be free to adjust it. At least, you can adjust it for your own purposes if your management is not accepting of reality.
So what is the “right” direction? It's high.
There's an interesting debate among project managers as to whether or not it is ethical to “pad” estimates for the purpose of dealing with future unknown needs. Some believe you must have pads and others believe it is unethical to give an estimate you know is higher than you think is accurate.
I fall into the camp of overestimating. However, I don't call this extra a “pad”. Instead, I call it a “reserve” that is the safety net should extra time, money and/or people be needed. Even Scotty never gave Captain Kirk the real estimate!
I don't see this as deception. I see it as contingency planning and a necessary part of any estimate. In my experience, it's better to come in “under” than “over.”
It's funny that the people I know to be the best estimators have been doing it a long time and their estimates seem very high at first. I think these people have learned the lesson of having reserves in the estimate.
Secret 3 – The Recipient of the Estimate Already Has a Number in Mind
This is why I say that estimation of anything is an inherently human activity. There's a lot of feeling involved and not much logic at times.
Understand that your customer has an expectation already in mind. If your estimate goes too far above or below the customer's early expectation, silent alarms go off in their head.
In the case of my fence project, I had a number in mind. It wasn't a low price and it wasn't too far off from the estimate I received. When I did get the estimate, at least I didn't have sticker shock. Had my expectation been a lot lower that the estimate, I would have probably looked for a cheaper option.
Once I had an experience in which I gave an estimate that was so much lower than a competitor's and I almost didn't get the work! The prospective client felt that because of the lower price I must have been leaving something out. Thankfully, they asked me to explain why my quote was so much lower and I explained it was because I had a faster and more effective way of doing the job.
Secret 4 - Your Customer Assumes Your Estimate is Too High
This is one of the biggest hindrances to good estimation. Let's say that you do your best job of estimation with no reserves included. You present these to your management or customer and they take one look and immediately reduce it by one-half because they believe you must have inflated it. After all, the last person they got an estimate from did so. Therefore, the assumption is that everyone who estimates has excess in the numbers.
What does this do? It forces people to pad their estimates because they know management will assume they have been inflated. Therefore, it is a self-fulfilling prophecy.
Secret 5 – Your Estimates are Incomplete
Most people estimate time and cost. How many people do you know that also estimate the quality of the product? Not many I would guess.
You have probably heard the old adage, “cost, schedule, quality – pick two.”
While it's true that it's very hard to deliver all three aspects, it's still possible. High quality will probably cost more and may take longer than lower quality – at least in the short term. In the long run, high quality costs less because of lower maintenance.
In software development and testing, we often fail to consider the quality levels in a given estimate. For example, how much would a test cost that found a few defects and resulted in a buggy product versus one that found many defects (or found the right ones) and resulted in a high-quality product? More often than not we estimate how long testing will take, how many people we need, and how much testing will cost. A lot fewer people estimate how many defects they find at the various levels of criticality.
Conclusion
As you go forth and estimate, keep these little secrets in mind and you will have less stress over your estimates. If you look at how people respond to your estimates, you will see many of the secrets in action. These are things you can't control. However, you can understand that the dynamics exist and be prepared to keep expectations reasonable.
Wednesday, February 24, 2010
Toyota and Software Problems
Here's the deal. More than ever, software is an integral part of the electronics that control cars. All software has defects. When a software defect causes a car to accelerate to 100+ mph, that's not a bug. That is catastrophic system failure. A few years back, Volvos were coming to dead stop at highway speeds because of software defects.
A friend of mine last year spent months trying to convince multiple Ford dealers that her Ford Expedition was stalling in the highway. They all said the Electronic Control Unit was fine. Eventually they found the problem - the ECU was bad.
The facts are not all in, but I would not be surprised if many of the Toyota problems are software defects.
My prediction for many years is that one day a major software failure will cause such death and destruction, that congress will start to regulate any software development with safety impact, much like is currently done in the FDA and NRC. The next big area of regulation will likely be transportation. Not that this is the answer. Regulations have fallen short because people find ways to get around them. Ultimately, quality is an ethical business issue.
For many, many years, Toyota has had a halo in terms of quality. Now that halo is gone and may never be recovered.
Keep an eye on this story.
Thursday, February 18, 2010
ISTQB Advanced Level Certification Public Courses
If you hold the ISTQB Foundation Level certification (CTFL) and are ready to move to the next level in ISTQB software testing certification, we are offering advanced level courses in Oklahoma City staring in May, 2010.The courses offered are ISTQB Advanced Core (2 days) and ISTQB Advanced Analyst (3 days). To sit for the ISTQB Advanced Analyst Exam on the last day of the course, both courses must be completed.
To see the complete schedule of all courses and pricing, click here.
If you would like to have advanced courses in your city in the USA and have 6 or more people that can attend, contact me and I would be happy to schedule a class close to you.
To learn more about ISTQB Advanced Level Certification and the pre-requisites, please click here.
Rice Consulting Services has teamed with Grove Consultants (http://www.grove.co.uk) to provide an outstanding training experience for advanced level certification.
I will be the trainer for these courses. I bring over 20 years software testing training experience in major organizations worldwide, as well as holding the full CTAL certification. The materials are licensed from Grove Consultants in the U.K. If you have seen any conference tutorials or presentations by Grove Consultants, you know the high quality and engaging nature of their presentations and materials.
ISTQB Advanced Level testers are an elite group in the USA right now, so now is the time to join that special minority of software testers and managers!
Friday, February 12, 2010
Foundation Exam and Book Now Included in ISTQB e-Learning
In our never-ending dedication to bring you the best value in training, we are excited to provide our students one electronic exam voucher per student as part of the registration. Each student also receives a copy of the book Foundations of Software Testing.
Our students have great success in passing the exam. Every student has direct access to Randy by phone and/or e-mail to answer any questions along the way.
Combine all this with a money-back guarantee, 12 months access to materials (even after you take the exam) and you have a great deal for preparing for the CTFL exam and building your testing skills to apply on your job.
Click here to read more about the course.
Click here to take a free demo.
Click here to buy a registration for the course.


Tuesday, February 09, 2010
Instant Software Testing Metrics
It seems that so many people I consult and train want quick and easy measures from their software development or testing efforts. I wish I had that shiny silver bullet, but in my experience and observation it takes time to really get the metrics in place that works for you and your organization.
And, really, you sure don't want to make decisions based on faulty information.
Here's why good metrics take time:
You Need History
At any point in time, a measurement is like taking one frame from a movie. For it to make sense, you need to see what has happened prior to the frame. To know how things turn out, you need to see what happens after the frame.
In software, this history starts when you start taking measurements. It continues as you keep measuring and refining your measurements.
The longer the history, the more accurate your understanding of your metrics tend to be. The key word is “understanding”. Your measurements may not necessarily get more accurate over time unless you keep questioning and improving them.
Too many people want to substitute other organizations' history for their own. I discourage this practice because every situation is different. Just because one company has a certain level of success with a given level of people or type of test technique doesn't mean you will have that same level of success.
Just start measuring a few key things that are easily obtainable and that are meaningful. It's important to track measures over time with specific dates associated with them. For example, you can start measuring the number of defects found by project. While this measure alone doesn't make a metric, you can start to see trends concerning the rate of defect discovery.
You Need Context
Metrics give context to measurements. A measure is a single count or extent of something, such as the number of defects. A metric is a measure taken in context with other measures. So, the average number of defects per function tells us the defect density from the functional perspective.
It takes time to know the best way to get this context and understand what it really means to you. I was once on a project where the client wanted to know how many test cases passed during a test. Fine. That's a good thing to know, right?
Then, people started to observe that the measure of passed tests has different meaning depending on when it is measured and reported. For example, a very high percentage of passed tests in the first round of testing may indicate the tests are too weak. Just before deployment, you want a high percentage of passed tests to indicate the application is ready to release. So, you may want to have two metrics: “first time tests that pass” and “final test pass percentage.”
You Need Time for Refinement
After you measure things for awhile, you may learn you aren't measuring the right things, or you may be measuring the right things in the wrong way.
It's fine and even expected to make major re-adjustments in your measurements. Just make sure to indicate on charts and tables when the adjustments were made.
You Need Growth
Please don't start a big metrics program with dozens of measurements. These programs often fail under their own weight. They are so big and complex, people either ignore them or give up quickly. Instead, start small and grow over time.
Metrics is a discipline that takes time and attention to do right. It also takes time to gain people's trust about how the metrics will be used. Sometimes people are fearful that the measures will be used against them, such as in a performance review.
You Need Early Successes
Pilot projects or proofs of concept are great to show the value of ideas and approaches. They reduce the risk of failure and gives you a place to practice and perfect things before trying them in the larger arena where everything becomes much more visible. It's a lot better to build positive public image based on small successes that to overcome the negative image from a major public failure.
You Need Management Understanding and Buy-in
As you grow and publish your metrics, management needs to learn the great value in them for the management of projects. Management also needs to get used to the information you can provide. They may suggest or request additional metrics or changes to existing ones. That's a good thing because it shows their minds are into the effort. This only happens over time.
Summary
I hope this shows why it takes time to get reliable and meaningful metrics. There are no magic answers, tools or techniques for getting a good set of metrics in place. That's why so few organizations reach this level. It's hard work and takes time, but it's worth the effort to show the added value you bring to your company. When you are “the” person that understands the metrics, that makes you a key person not only for your team, but for your company...and that's a very good thing!
Free Virtual Conference on Application Performance Management
Here's the announcement from SearchSoftwareQuality.com:
We're just 2 weeks away from the complimentary virtual seminar
'Application Performance Management: Build, Bug and Lifecycle
Strategies.' Gain access to industry experts and real-world
practitioners who reveal new insights to boost app performance and
ensure it remains a key focus throughout your application development
lifecycle.
Don't miss this opportunity - register here and mark your calendar:
http://go.techtarget.com/r/10840914/7113473
===============================================================
TITLE: Application Performance Management: Build, Bug and
Lifecycle Strategies
WHEN: Wednesday, February 24, 2010
TIME: 9:30 am - 6:00 pm EST
WHERE: Your Desktop
COST: Free
REGISTER FOR THIS VIRTUAL SEMINAR TODAY:
http://go.techtarget.com/r/10840915/7113473
===============================================================
TOP 5 REASONS TO ATTEND THE APPLICATION PERFORMANCE MANAGEMENT
VIRTUAL SEMINAR:
1. GET PRACTICAL INFORMATION TO USE IMMEDIATELY
Hear relevant advice that you can put into action right away to help
your organization build the foundation for high performance. No
pie-in-the-sky theories, just practical, useful information from
today's top performance experts.
2. EXPAND YOUR NETWORK OF PEERS
Share insights and discuss relevant strategies in our unique virtual
environment with those facing the same challenges you're up against
when testing and setting the stage for monitoring and maintaining
application performance throughout its lifecycle. Stop by the
networking lounge to hear success stories and lessons learned.
3. INTERACT WITH EXPERT SPEAKERS DURING OUR PANEL DISCUSSION
Discuss performance implications and testing tools for running
application components in private and public clouds. Don't go it
alone when you can benefit from the experience of these true
performance and cloud experts.
4. PRIZES!
Sessions are an intensive, educational experience that will prove
incredibly valuable to your organization, but we've built in some
fun, interactive breaks during which we'll announce our prize
winners. Attend the day's seminar for a chance to win a Sony
Cyber-shot camera, an Amazon.com gift card, or a book on dependency
injection. You'll have multiple chances to win - by visiting a booth,
attending a session and just for coming to the event!
5. INTERACT WITH TOP VENDORS
Speak directly to leading performance vendors and test drive the
latest solutions with live product demos. They understand your pain
points, and strive to help you make the best IT investments for your
organization.
Ensure quality in your application performance management. Register
with one click here:
http://go.techtarget.com/r/10840916/7113473
Friday, February 05, 2010
Book Review - Managing the Testing Process, 3rd Ed. – Rex Black
Published by Wiley, 2009, 638 pages
In the third edition, Rex extends a work he started in 1998 with the first edition. At that time, and still today, practical books on software test management are in a minority of the books on software testing. This book has become a commonly referenced work on software test management for a reason - it is practical.
Two things I really like about this book are that it is very readable and it has broad coverage of test management topics. As a trainer of thousands of test managers, I have learned that many test managers are thrust into the role with little knowledge or preparation. So, my perspective is that test managers need to know the mechanics of the software test profession as well as the managerial and leadership aspects of the job. This book delivers well on both counts.
By reading and applying the information in this book, you will learn the testing process from test planning and building the test architecture to building a test team, measuring test results, and conveying those results in a value-added way. Rex covers topics that are very relevant including test outsourcing and the context of projects and software lifecycles. I also very much appreciate the discussion of dealing with the people issues in testing.
Just a note on the use of spreadsheets and vendor non-specific tool examples is that once you understand the structure of organizing testware, you can apply that structure in a specific test tool. Plus, not everyone owns a commercial test management tool. I know many people who manage a lot of test items using Excel.
I can highly recommend this book to test managers and leaders, as well as people who aspire to be in those roles.
Randy Rice
Wednesday, February 03, 2010
Software QA and Testing Salaries
Wednesday, January 20, 2010
Articles of Interest
1) Here's a great slide show. Those of us who are in the software quality field will recognize the "7 Deadly Sins of IT" - http://www.cioinsight.com/c/a/IT-Management/Deadly-Sins-of-IT-Operations-658137/?kc=CIOMINUTE01202010CIO1
I think it's great to see this kind of thing in CIO Insight!
2) In my Becoming an Influential Test Team Leader workshop we talk about how to influence management. Here is a great article from Michael Hyatt on making a pitch to your boss: http://www.stumbleupon.com/su/4ff3lg/michaelhyatt.com/2007/01/how-to-get-your-boss%E2%80%99s-approval-when-you-need-it.html/r:t
Enjoy!
Wednesday, January 06, 2010
Tester to Developer Ratio Initial Research Findings
This short article is to document early findings and I plan to continue surveys and data gathering, so if you did not get in on the first round of surveying, I would like to hear about your ratios.
The participants of the recent survey were subscribers to my newsletter, The Software Quality Advisor, and the audience at my StarWest tutorial on Becoming an Influential Test Team Leader. There were 53 respondents in all, mostly from North America, but six were from Europe and one was from Asia.
I asked four questions:
1) How many developers are in your organization?
2) How many testers are in your organization?
3) On a scale of 1 to 6, where 1 is poor and 6 is super, how would you rate the effectiveness of your current ratio?
4) Do you have any anecdotal information about how your current ratio effectiveness?
The leanest ratio was twenty developers to one tester (effectiveness rating of “two”), while the richest ratio was fifteen developers to eighteen testers (effectiveness rating of “four”). There was one anomalous response of four developers to zero testers (The effectiveness rating on that one was “three”). The average ratio was 4.52 developers to one tester. The most common response was three developer to one tester (six responses), the next most common was 2.5 developers per tester (five responses). There were twenty-six responses with developer to tester ratios of 3:1 or lower.
Here are some of my initial observations and comments:
1) The responses varied greatly.
For those looking for an “industry norm” of developer to tester ratios, this may show that the range of workable ratios is wide. Effective testing may be achieved by better practices, tools and leveraging developer-based testing instead of having more testers.
2) Over half of the responses were at the “richer” ratios.
The average effectiveness reported by this group (3:1 or less) was four – above average. Interestingly, the average effectiveness for the higher ratios was three – average, and not a huge difference from the lower ratio group.
3) In the higher ratio group, there were some with higher than average test effectiveness of four or five.
This tells me that you have a higher ratio and still be effective at software testing. Put another way, the magic of good testing may not be in the ratio of developers to testers.
I have always questioned the idea of using developer to tester ratio as a way to staff or estimate testing efforts. Sheer body count is just not enough information to base testing effort upon.
That said, I think developer to tester ratios may be a helpful metric to understand the workload in a test organization. For example, if I were presented with a situation where the developer to tester ratio is ten to one, I would ask:
- Are any test automation tools being used? If so, how effective are they?
- How much responsibility do developers have in the testing process?
- Is testing based on risk?
- Are test optimization techniques used in test design?
- What is the defect detection percentage (DDP)?
- Are defect trends tracked and studied?
- Have the developers and testers been trained in software testing?
- Is there a defined testing process in place and being used?
I did this on my first job as a test manager. I had a team of three people testing the work of thirty developers. The ten to one ratio told me that we could not test all the work coming our way.
We had no tools, just our wits. So, we developed a strategy:
1) Get management to lead the way to make the message to developers that testing is part of their job
2) Train and mentor each developer to be a good tester
3) Test the high risk changes at the highest priority
4) Test anything a developer asked us to test (unless there was no documentation)
5) Do not test anything without a defined user requirement
6) Use cause/effect graphing and other test optimization techniques to get the most testing from the fewest tests
7) Build a robust and repeatable test data set for manual regression testing
The result was that 1) we kept up with the workload and 2) the error rate went from 50% of changes with defects to 2%. At this point, we still had a ten to one developer to tester ratio. This may work for you, too. If it does, please send your check made out to Rice Consulting Services at P.O. Box 892003, Oklahoma City, OK 73170. :-)
I hope this information helps you understand your own ratio a little better. If you would like to contribute your own ratio to my data, just reply to me here with the four items:
1) How many developers are in your organization?
2) How many testers are in your organization?
3) On a scale of 1 to 6, where 1 is poor and 6 is super, how would you rate the effectiveness of your current ratio?
4) Do you have any anecdotal information about how your current ratio effectiveness?
Thanks!
Tuesday, December 08, 2009
Jim Rohn Has Left the Building
As not only a software tester, but a business owner, I learned early on that I had to learn about what it means to be successful in business. Not in a greedy way, but in a way that helps others. Mr. Rohn taught me how to do that.
I'm not a believer in "The Secret" - the idea that you attract the things that come into your life - good and bad. (I do believe we can attract certain things by what we do, but that's different.) Anyway, I did have an experience that was amazing in the realm of goals.
I started Rice Consulting back in 1990 with no idea of where it would lead or even if it would be successful. I just knew that very few consultants and trainers specialized in testing at that time.
Before long, I realized my business lacked direction and control, so I started looking for how to get that positive direction. One resource I found was a tape set called "The Art of Exceptional Living" by Jim Rohn. I listened to those tapes at least a dozen times while I would be on walks, driving, etc. In fact, I still listen to them on occasion.
I thought, "I would sure like to meet Mr. Rohn in person one day." Then, amazingly about six months later he came to Oklahoma City to present a half-day session on The Seasons of Life. I bought the VIP ticket so I could attend a pre-event reception. I remember like yesterday seeing Mr. Rohn standing at the side of the room with no one else around, so I introduced myself and asked if it was OK to ask a question. He graciously said, "Of course."
I asked Mr. Rohn a question I would not have asked anyone else because I knew he came from the same spiritual perspective as me. "Do you think it is possible to be too rich?" I asked.
He paused, pursed his lips and said, "Well...let me see...Is it possible to be too happy? Or too healthy? Or have too many good relationships? No...I don't think you can be too rich."
Now, context is important here. I had heard Jim's teaching on "enlighted wealth" where it's not the accumulation of prosperity for the sake of ourselves, so I knew he was not advocating wealth at any cost. I was just curious because of my lower middle class background and past spiritual teachings.
Since then, I have heard him say that humans are the only creatures that place limits on their own growth. So, it would be like asking, "Can a tree grow too tall?"
Jim was the person that taught me the importance of communication and how ideas are conveyed. He also taught me that it's possible to create something tangible from something intangible, like an idea.
Jim touched millions of people around the world. If you would like to see the tributes, there are many at http://tribute.jimrohn.com/. There are also some video clips there of his teaching. If you are inspired and want to go deeper, I highly recommend "The Art of Exceptional Living (abridged version)" or full version as a starting point.
Jim Rohn will be missed, but he left a legacy of teaching that will endure for a long, long time. I know he is in a better place.
Tuesday, November 24, 2009
Back in the USA, Flu and all
It's good to be back in the USA. The courses in Rome went very well. It's always fun and the people are super, but also a challenging adjustment to be teaching from 2 a.m. to 10 a.m. body time. It's also nice to do things without converting time, money, language or electricity.
Janet went with me on the trip and we saw some sights both in London and Rome. I was able for the fifth or sixth straight year to get my annual journal at Harrods. It winds up costing me about $50, but that's a motivator to actually use it. That has become a tradition for me.
I promised Janet that the first thing I would do is buy a cup of Starbucks coffee in NYC, since we arrived at JFK, took a taxi to LaGuardia and then after spending the night at a really nice Hampton Inn (I'm serious, it was great), on to DFW and OKC. All went well until DFW, then the flu hit me and the last thing I wanted was coffee. Those who know me know coffee is a very, very important thing to me, so Janet knew I was sick. That and wearing a coat while shivering.
I went to the doctor yesterday and he confirmed flu, but not sure of "regular" or "swine". He percribed Tamiflu and I'm feeling much better today, so I'm thinking "regular".
Back to the coffee...The gentle bagage handlers managed to break my French press on the way back home. Also, I took several packets of the new Starbucks VIA instant coffee on the trip and it helped. I give the Starbucks people credit for a good instant coffee. It's not that I hate Italian coffee, it just that the intensity is pretty strong - basically expresso.
I plan to return there in June to teach Innovative Software Testing Approaches, one I've taught there before, and Practical Software Test Automation, a new class for the spring I am very excited about.
Well, back to resting some. By the way, I'll be posting soon the prelimiary research on the tester to developer ratios.
Until then, I wish all in the USA a blessed Thanksgiving!
Sunday, October 25, 2009
Join Me in Rome for Software Testing Courses in November

Hi everyone,
For those of you in Europe, or anyone interested in visiting Rome and attending a testing class, here's your chance. On November 16 - 20, I'll be presenting two popular courses:
Testing SOA (Nov. 16 - 17, 2009)
Advanced Software Testing (Nov. 18 - 20, 2009)
Just click on the links above for more information and to register go to www.technologytransfer.eu.
I hope to see you there!Randy
Tuesday, October 20, 2009
EuroStar 2009 Software Testing Conference Ticket on eBay!
Here's a great deal, especially for those of you reading this in Europe. Last year, I won a conference pass to this year's EuroStar Testing Conference to be held in Stockholm, Sweden.
I can't use the pass this year, so I have placed it up for auction on eBay. The starting price is $500 and the auction lasts for 10 days. So, if you are looking for a great deal on a great conference, here's your chance!
http://global.ebay.com/EuroStar_2009_Testing_Conference_-_Stockholm_Sweden/190346246440/item
Thanks,
Randy
Tuesday, October 13, 2009
Major Apple Snow Leopard Defect...Warning
I'm not one of those Mac users who downplay the problems just to make the Mac look better than a PC! There is a major problem with Snow Leopard that everyone should be aware of. Under Snow Leopard when you log into a guest account, you lose all your data. I think this may have happened to my son. All I know is he lost everything, too. Here is a full account of the problem from Computerworld:
http://www.computerworld.com/s/article/9139250/Snow_Leopard_bug_deletes_all_user_data?source=CTWNLE_nlt_pm_2009-10-12
So...if you have upgraded to Snow Leopard, keep making those backups and don't log in to a guest account! Oh, and to Apple...fix it!!! I can see the new Mac vs. PC commercials now (of course, it would need to be a parody since Apple won't make an ad where their guy just disappears!).
Thursday, October 08, 2009
StarWest 2009
I'm returning home from StarWest 2009 and found some time to blog as we are delayed out of Orange Country airport by about 3 hours.
It was a good conference. I was glad to see a higher attendance than at StarEast this year. In fact, the conference had a good feel for the week attendance-wise. It makes me hopeful that the economy is coming back.
There also seemed to be quite a few international attendees and people from the central and eastern parts of the U.S.
My Monday tutorial on Becoming an Influential Test Team leader went well and the two track sessions (one on Cheap and Free Test Tools and the other on Making Your Defects Pay) seemed to go well also. It's always great to meet new people and hopefully provide some helpful information.
It was also great to connect with friends. I really enjoyed Lloyd Roden's keynote on Top Testing Challenges. He and I approach the challenges from different perspectives, mine from a survey basis and Lloyd's from an observation perspective, but I really have a lot to think about from his session. I have been working a lot with test metrics lately and Lloyd's thoughts on making metrics meaningful and accurate is one that we should all take to heart. Everyone talks about test metrics, but few understand the work it takes to define them for a particular organization. I'll blog more about that later.
I also enjoyed Julie Gardner's session on test environments. Very few people tackle that topic in a conference setting and she did a good job on striking a balance of covering the topic without getting too specific.
I heard several people say they had a hard time deciding which sessions to attend. To me, that's the sign of a good program. It seemed that people were picking up lots of good testing tips and techniques.
The vendor expo was pretty well attended by vendors and attendees. Once again, another hopeful sign of an economic recovery.
So, I give the conference high marks. Kudos to SQE for a great conference.
On my free day, Tuesday, Janet and I went to a taping of the Jay Leno Show, but got there a little late. So, instead being part of the studio audience, we got to watch the outdoor segment where Tim Allen raced a Ford electric car. That was fun. We were just a few feet away from Tim and Jay and we were on camera, too. Last year, Jay waved at us at the stop light as he was one his way home driving his Arial Atom hot-rod.
http://www.thejaylenoshow.com/video/episodes/#vid=1164214/?__source=recent-eps-module
Later,
Randy